Navera Brampton › Blog › Basement Side Entrances on New Brampton Homes

Basement Side Entrances on New Brampton Homes: What 'Grade Permitting' Means

What Navera's side entrance and basement rough-ins give you, and what a legal second unit still needs.

The short answer

A "grade-permitting" side entrance is a door from the basement to the side yard that the builder installs only where the lot's grading allows it. At Navera, DiGreen Homes' feature sheet includes that door where grade permits, about 9′ ceilings in the basement and a 3-piece plumbing rough-in. Those make a future basement suite easier, but a legal second unit in Brampton still needs City approval and permits.

What Navera includes for the basement

  • About 9′ ceilings throughout the home, including the basement
  • A 3-piece plumbing rough-in in the basement
  • A side entrance door from the basement, where grade permits
  • 200-amp electrical service, which leaves room for a future suite's load

See every item on the included features page.

Why "where grade permits" matters

Not every lot slopes the way a side door needs. The site plan decides it, so the lot you choose decides whether you get the door. Ask for the grading information on each lot you're considering before you submit a worksheet.

What a legal basement unit still needs

  1. Compliance with the City of Brampton's rules for additional residential units
  2. A building permit and registration of the unit
  3. Fire separation, egress windows and other Ontario Building Code requirements
  4. Finishing the space, which the builder's rough-ins don't cover

Confirm the current requirements with the City of Brampton before you count on rental income.

Which plans make sense for a suite

Larger plans like the six-bedroom 38-03 Loft leave the main house roomy even if the basement becomes a suite. Ask for the basement layout of each plan you're considering; the floor plans go to registered buyers with the price list.

Questions buyers ask

What does 'grade permitting' mean for a side entrance?

It means the builder installs a side entrance door from the basement only where the lot's grading allows it. Whether your lot qualifies depends on the site plan, so ask before choosing a lot. The RE/MAX Gold Realty broker team in Brampton checks lot details for registered buyers.

Can I add a basement apartment to a new home in Brampton?

Possibly. The City of Brampton requires additional residential units to meet its zoning and building rules and to be registered with permits. A side entrance and rough-ins help, but they don't make a unit legal on their own. Check with the City before you plan rental income.

What basement features does Navera include?

According to DiGreen Homes' feature sheet, Navera homes include about 9′ ceilings throughout including the basement, a 3-piece plumbing rough-in in the basement and a side entrance door from the basement where grade permits.

Navera details from DiGreen Homes' feature sheet, September 2026. Not legal or zoning advice. E.&O.E.

Get Platinum Access to Navera

Price list, floor plans and launch updates, sent to you before the public release.

Are you a realtor?

Free. No obligation.

More buyer guides

Keep reading

Get Platinum Access to Navera

Price list and floor plans before the public launch. Registration is free.

Get Platinum Access
CallPlatinum Access